National History Day 2012-2013 Due Date: 1/10/12 Types of Projects Accepted: DocumentaryPerformancePaperWeb Site
Nation History DayImportant Dates
I have decided to require the NHD project to be turned in several steps. The reason for this is the lack of response that I received from the earlier worksheet that was due last Friday.
Each item will be worth 55% of your grade. Each day the assignment is late I will subtract 15 points.
Timeline:
Rough Draft of Thesis: 8/24
Sources Review list: 8/31
Format of Project Decision: 9/7
Thesis Due: 9/14
Rough Draft of Bibliography: 10/5
Rough Draft of Annotated Bibliography: 11/02
Rough Draft of Project due: 11/16
Process Paper due (1paragraph): 12/07
Project Due: 1/10
Turn in project any time prior to January 10, 2012.
2012-2013
Due Date: 1/10/12
Types of Projects Accepted:
DocumentaryPerformancePaperWeb Site
Nation History DayImportant Dates
I have decided to require the NHD project to be turned in several steps. The reason for this is the lack of response that I received from the earlier worksheet that was due last Friday.